Assess the existing door
Inspect the cylinder, fittings, strike plate, leaf and frame together. Windows, balconies and other accessible entrances may also need attention.
Clarify permission before alterations
Speak to the landlord or property manager before structural changes. Clarify installation, responsibilities and what must happen when the tenancy ends.
Choose measures for the actual weak points
Mechanical upgrades can include protective fittings, additional locks, crossbars or window locks. Select them for the door and frame rather than for a product name alone.
Use electronics as a complement
Alarms and cameras may supplement mechanical protection. Consider daily operation, technical requirements, ongoing costs and privacy before selecting them.
Make sure everyone can use the system
Discuss key handling, emergency functions and operation by all authorised users. Agree priorities and budget before installation.
The key steps
- Identify existing weak points.
- Obtain necessary permission.
- Prioritise measures by actual need.
- Review operation with all users.
Further guidance
Berlin Police provides information on burglary prevention and consumer protection (German). For a specific job, clarify the situation, price and responsibilities directly with the company you appoint.
